Holding yard capacity is the number a buyer asks for and the one neither of these pages publishes. A yard is quoted in panels and ordered against a mob, and the two do not convert into each other: the cattle yard pages publish panel lengths of 2.07 m, 2.09 m and 2.1 m, and the yard panel page adds 2.8 m, but neither publishes a stocking rate or the length a panel contributes once it is pinned to the next.
So the take-off for store cattle is three counts, and only one of them is arithmetic you can do today. How much room each beast gets is a husbandry decision. How many bays close a perimeter is a division. How much of every bay disappears into the lug and pin joint is a factory answer these pages do not give.
Key Takeaways
- Published lengths disagree. The cattle panel page lists 2.07 m, 2.09 m and 2.1 m; across 30 bays that range is 62.1 m against 63.0 m, a 900 mm spread on one line.
- The yard panel page adds a 2.8 m length. The same 42 m of perimeter is 20 bays at 2.1 m or 15 bays at 2.8 m.
- Gates come out before you divide. Per the pages: cattle panel gate 2.25 m, man gate 0.85 m, sliding gate 1.06 m, race bow 0.83 m, crush 1.06 m with a 0.75 m internal length.
- Panels join on welded lugs and pins, listed as two sets of double lugs plus two single lugs per panel with 16 mm pins, and no overlap dimension is published, so the clear length per bay is an open number.
- Neither yard page publishes a stocking rate. Head count to square metres is a stockman’s, a vet’s or a receiving centre’s figure, and a panel count built on somebody’s unquoted assumption is not a specification.
In this guide
Head Count Is Not A Panel Count
The yard in the photograph is a ring of bays, and that is the whole of its capacity. Nothing about it says how many beasts it should hold, because that number depends on the animals, how long they stand, whether they are being fed in there and whose welfare rules apply on the day. Neither of the livestock yard pages read here publishes a stocking rate, and a supplier who converts a mob size into a panel count without asking for that figure is doing arithmetic on an invented input.
Start from the other end. Fix the floor area you have been told to build, and the panel count falls out of the perimeter, which is the part a supplier can quote. The mob sets the area through a stockman or a vet, the area sets the perimeter, the perimeter sets the bays, and only the last step belongs on a purchase order. My position after counting these pages against each other: refuse any yard quote that arrives as a head count, because the bays it implies were never derived from anything you can check.
The Published Lengths Do Not Agree
The yard panel page states its panels are used to establish holding yards of various sizes, which is the promise. Here is what the numbers behind that promise actually do.
| Item | Published figure | Effect on one run |
|---|---|---|
| Cattle panel length | 2.07 m, 2.09 m and 2.1 m (cattle panel page) | 62.1 m against 63.0 m across 30 bays |
| Yard panel length | 1.0 m high, in 2.1 m and 2.8 m lengths (yard panel page) | 42 m of line is 20 bays or 15 bays |
| Gates | Cattle panel gate 2.25 m, man gate 0.85 m, sliding gate 1.06 m, race bow 0.83 m | 3.10 m leaves the panel count when one of each of the first two is fitted |
| Crush | 2.05 m high x 1.06 m long, internal length 0.75 m | Occupies 1.06 m along the line, where a bay would have given 2.1 m |
| Joint hardware | Two sets of double lugs and two single lugs welded per panel, 16 mm pins included | No overlap length is published, so bays multiplied by length is not the line you get |
That last row is the one that bites. The panels join through welded bracket lugs and pins, which is what makes a yard portable and removes the need to dig holes or lay foundations, per the pages. But a lug has thickness and a double lug holds two panels against each other, so the distance a bay contributes is less than the length printed beside it. No figure for that is published, which means every count here is nominal until you have it. Ask for it as a dimension, not as a drawing you have to interpret.
Worked Take-Off For A Twelve Metre Square
Take a holding yard 12 m on each side. Perimeter line is 48.0 m. Fit one cattle panel gate at 2.25 m and one man gate at 0.85 m, and the panels have to close 44.90 m.
- At 2.1 m bays: 21 bays give 44.10 m, a total line of 47.20 m and a shortfall of 0.80 m. Twenty-two bays give 46.20 m, a line of 49.30 m and 1.30 m to give away.
- At 2.07 m bays: 21 bays give 43.47 m and a line of 46.57 m, 1.43 m short; 22 bays give 45.54 m and 48.64 m, 0.64 m over.
- At 2.8 m bays: 16 bays give 44.80 m and a line of 47.90 m, which is 0.10 m short — the closest fit on length alone. But the yard panel page publishes 2.8 m against a 1.0 m panel height, so confirm the height before treating that option as a store-cattle holding yard.
Every one of those answers leaves a residual between one-tenth of a metre and 1.43 m, and a residual is not a rounding detail. It is either an open corner, a bay that has to be cut, a gate frame packed out, or a last joint left slack. Which one you accept changes what you order, and it is far cheaper to decide at quotation than on the last afternoon before stock arrive. Add the unknown from the joint row above and the residual moves again: with roughly twenty-plus joints in that run, a per-joint overlap you have not been told about is multiplied that many times, in a direction you cannot yet sign.
Four Answers To Collect Before The Order
- Clear bay length after joining. Ask what a panel measures from pin centre to pin centre once a double lug takes both panels, and how that changes at each corner. This single number replaces the nominal length in every line of your take-off.
- Which of the three lengths is actually being shipped. The page lists 2.07 m, 2.09 m and 2.1 m without tying a length to an item, and 900 mm of line across 30 bays turns on that choice.
- The gate and crush schedule, in metres of line. A 2.25 m panel gate and a 0.85 m man gate remove 3.10 m from the bay count; the crush is listed as 2.05 m high x 1.06 m long, so it takes 1.06 m along the line where a bay would have added 2.1 m.
- The area figure, from whoever owns the animals. Get it in writing from the stockman, the vet or the receiving centre that sets the standard for that mob, and put it on the enquiry as the input rather than leaving it implied by a head count.
How those bays then behave as a working yard — the curve of a race, where a mob slows, which corner a load of store cattle back into — is a separate question and is dealt with in the note on drafting race geometry. What a panel is structurally, and why six oval rails in a square post frame carry load the way they do, is set out under the rail and frame explanation. This page stops at the count, and the lengths it counts are on the cattle panel page.
Frequently Asked Questions
How many panels do I need for a mob of store cattle?
Not answerable from a mob size alone, and no stocking rate is published on these pages. Get the floor area your animals require from the person responsible for them, then divide the perimeter by the clear bay length, after subtracting gates and a crush.
Is a holding yard panel 2.1 m or 2.07 m?
The cattle panel page lists 2.07 m, 2.09 m and 2.1 m as available lengths, so both are correct and they are not the same panel. Confirm which one your order ships before you finalise a count.
Do panels lose length at the joints?
They should, since the pages list welded double and single lugs with 16 mm pins, and a lug has thickness, but no overlap figure is published. Ask for centre-to-centre spacing so your count reflects the line rather than the catalogue length.
Should the gates be counted as panels?
No, and this is where counts go wrong first. A 2.25 m cattle panel gate and a 0.85 m man gate replace 3.10 m of panels, so deduct their lengths from the perimeter before you divide.
Conclusion
Holding yard capacity is not a panel count wearing a different coat. The mob gives you an area, the area gives you a perimeter, and only then do published lengths and gate lengths give you bays. Skipping the middle step is how a yard can arrive short on the day the stock do.
Before the next yard order, put the floor area, the length being shipped, the clear bay measurement and the gate and crush schedule on one sheet, and count from there. Send us that sheet and the quote comes back as bays, with the clear bay measurement the factory confirms in writing.